Embraer finished 2Q25 with a US$29.7 billion backlog
Share this Post

Embraer finished 2Q25 with a US$29.7 billion backlog


Commercial Aviation reported an eight-year backlog record of US$13.1 billion in 2Q25. (The previous record for the division was US$13.4 billion in 4Q17.) The backlog increased 31% compared to 1Q25 and 16% versus 2Q24. Alongside its strong sales performance …

Other Blogs

Virgin Australia Mulling Own Widebody Aircraft Order Aerospace

Aug 03, 2025

Virgin Australia Mulling Own Widebody Aircraft Order
Readmore
Virgin Australia Mulling Own Widebody Aircraft Order Aerospace

Aug 03, 2025

Virgin Australia Mulling Own Widebody Aircraft Order
Readmore
RBC Bearings Incorporated (NYSE:RBC) Q1 2026 Earnings Call Transcript Aerospace

Aug 02, 2025

RBC Bearings Incorporated (NYSE:RBC) Q1 2026 Earnings Call Transcript
Readmore
RBC Bearings Incorporated (NYSE:RBC) Q1 2026 Earnings Call Transcript Aerospace

Aug 02, 2025

RBC Bearings Incorporated (NYSE:RBC) Q1 2026 Earnings Call Transcript
Readmore
RBC Bearings Incorporated (NYSE:RBC) Q1 2026 Earnings Call Transcript Aerospace

Aug 02, 2025

RBC Bearings Incorporated (NYSE:RBC) Q1 2026 Earnings Call Transcript
Readmore